| Details1. Project Owner: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY1 2. Investment form: Built – Own - Operate (BOO) 3. Salient features:             + Installed capacity:    57MW             + Mean annual energy: some of 230 million kWh             + Total investment capital: 1 372 billion Vietnam Dong 4. Construction schedule: the project was started its construction in 01-2010, with following targets:             + Commissioning unit 1: July 2012             + Commissioning unit 2: September 2012             + Full Operation: quarter 4/2012 SOME PHOTOS ON CONTRACT SIGNING CEREMONIES FOR SÔNG BUNG 5 HYDROPOWER PROJECT .jpg) 
 Credit contract signing with VietinBank, Nguyễn Trãi branch on 14-08-2009  .jpg) Signing contract for package XD-01 with Construction 47 JSC on 21-12-2009 .jpg)
 Signing contract for package TB-02 vwth Lilama 45.4 on 15-04-2010 .jpg)
 Signing contract for package TB-01 with Zhongnan-Zhefu on 21-8-2010 |