Details
1. Project Owner: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY1
2. Investment form: Built – Own - Operate (BOO)
3. Salient features:
+ Installed capacity: 57MW
+ Mean annual energy: some of 230 million kWh
+ Total investment capital: 1 372 billion Vietnam Dong
4. Construction schedule: the project was started its construction in 01-2010, with following targets:
+ Commissioning unit 1: July 2012
+ Commissioning unit 2: September 2012
+ Full Operation: quarter 4/2012
SOME PHOTOS ON CONTRACT SIGNING CEREMONIES FOR SÔNG BUNG 5 HYDROPOWER PROJECT
Credit contract signing with VietinBank, Nguyễn Trãi branch on 14-08-2009
Signing contract for package XD-01 with Construction 47 JSC on 21-12-2009
Signing contract for package TB-02 vwth Lilama 45.4 on 15-04-2010
Signing contract for package TB-01 with Zhongnan-Zhefu on 21-8-2010
|